There are three detour options being considered while the bridge is being replaced. The three options are below.
![Map detour route option 1. Using County roads 11, 10, 40 and 3 for a detour length of 43.5 kilometres](http://www.paisleybridgestudy.ca/wp/wp-content/uploads/2020/05/13127-Fig3.1-Detour-Option-1-1-1024x791.jpg)
![Map detour route option 2. Using municipal roads with two options for a detour length of 13 or 18 kilometres](http://www.paisleybridgestudy.ca/wp/wp-content/uploads/2020/05/13127-Fig3.2-Detour-Option-2-1024x791.jpg)
![Map detour route option 3. Requiring a temporary bridge to be built, detour length of 425 metres.](http://www.paisleybridgestudy.ca/wp/wp-content/uploads/2020/05/13127-Detour-Option-3-Aerial-Photo-1-791x1024.jpg)
Replacement of the Teeswater River Bridge
There are three detour options being considered while the bridge is being replaced. The three options are below.